Home » Other

Other

A. Skrappy Design Strategy

With monetary and time limitations, the team will review and select a strategy and usually but is not limited to the strategy within our capabilities to maximize our ability to score.

B. Engineering Assurance in Design and Operation

C. Robot Review (2020 Season Reveal scheduled on or before 1 March 2020.

D. District Events.

l. Richmond Event is scheduled 06 to 08 March 2020

2. Blacksburg is scheduled 20 to 22 March 2020

November 2019
M T W T F S S
« Oct    
 123
45678910
11121314151617
18192021222324
252627282930  
WordPress Appliance - Powered by TurnKey Linux